- What You Actually Pay For
- The $90 Exam Fee and How It Works
- Retake Math: What a Failed Attempt Costs
- Costs We Can't Put a Number On
- The Hidden Cost of Eligibility: Hours and Schooling
- Test Center vs. Remote: Cost Implications
- Code Books and Reference Materials
- Prep Spending Tied to the Exam Blueprint
- Costs After You Pass: Renewal and Code-Cycle Training
- Budget Table at a Glance
- Frequently Asked Questions
- The New Hampshire journeyman written exam fee is $90 per attempt, and retakes cost the same $90.
- State licensing charges beyond the exam fee were not verified, so confirm them with the OPLC before budgeting.
- The real expense is eligibility: 8,000 field hours plus 600 schooling hours or an approved alternative.
- Licenses renew every two years, and a separate 15-hour NEC-change course applies each code cycle.
What You Actually Pay For
When people ask about the cost of the New Hampshire Journeyman Electrician License Exam, they usually mean one number. In practice, the cost of becoming a licensed journeyman in New Hampshire is spread across several layers: the exam fee, the state's licensing process, the years of supervised work and schooling required to become eligible, your reference materials, your preparation, and the recurring obligations that begin once you hold the license.
This guide separates what is verified from what is not. The New Hampshire Electricians' Board, part of the Office of Professional Licensure and Certification (OPLC), oversees licensure, and the written exam is administered by Prov, Inc. Only one dollar figure is firmly established for the exam itself, and we will not guess at the rest. If you want the full picture of what the credential involves beyond price, start with our overview of NH-JE requirements, eligibility and how to qualify.
The $90 Exam Fee and How It Works
The written examination fee is $90 per attempt, effective February 1, 2025. That figure includes retakes, meaning every sitting is priced at the same $90 rather than a higher or lower rate on later attempts. The exam is a computer-delivered, multiple-choice test of 110 questions with a 270-minute time limit, and a 70% score is required to pass.
A few mechanics shape how you spend that $90 wisely:
- Board approval comes first. You need approval from the Electricians' Board before you can test, so the exam fee is not the first step in the process.
- Eligibility lasts 365 days. Once approved, your window to test runs for 365 days. Scheduling and paying for an attempt you are not ready for burns part of that window.
- Retakes require a two-day interval. You cannot rebook immediately after a failed attempt, which limits how quickly you can convert a near miss into a pass.
For a closer look at scheduling windows and deadlines, see our guide to NH-JE exam dates, testing windows and scheduling.
Retake Math: What a Failed Attempt Costs
Because the fee is a flat $90 per attempt including retakes, the direct cash cost of failing is simply another $90 for the next sitting. That is modest compared with exam programs that escalate their retake fees. The larger cost of a failed attempt is time: the mandatory two-day gap, the shrinking portion of your 365-day eligibility window, and the lost momentum.
| Scenario | Exam fees paid | What it means |
|---|---|---|
| Pass on first attempt | $90 | Single sitting, lowest direct exam cost |
| Pass on second attempt | $180 | Two sittings at $90 each; at least a two-day gap between them |
| Pass on third attempt | $270 | Three sittings; watch the 365-day eligibility window |
These totals cover only the exam fee. A pass requires 70%, which is a passing-score threshold, not a pass rate. We have not verified any official cohort pass-rate statistics, so you will not find an invented one here. For what is and is not known, read what the data shows on the NH-JE pass rate and exactly what you need to pass.
Costs We Can't Put a Number On
Beyond the exam fee, you should expect the state to charge for the licensing process itself. Those separate state licensing charges are not quantified in this article because they were not verified. Rather than quote a figure from a commercial summary or an older source, treat the OPLC's electricians' board page as the authority and confirm current amounts before you build a budget.
- Check the Electricians' Board page on the OPLC site for current application and licensing charges.
- Ask whether any fees are due at application, at approval, or at license issuance, since timing affects cash flow.
- Keep receipts and confirmation numbers for every payment tied to your approval and your 365-day testing window.
The Hidden Cost of Eligibility: Hours and Schooling
The single largest cost of the journeyman path is not money paid to the state. It is the work and education required before you may test. Under the qualification rule (Elec 304.01, as republished by Cornell LII), candidates generally need 8,000 practical, field apprenticeship hours under a Board-licensed journeyman or master, plus one of the prescribed education or experience alternatives.
Education and Experience Alternatives
In addition to the field hours, the retrieved rule text describes the following paths:
- Electrical schooling: 600 hours, including 24 safety hours. A qualifying electrical associate or higher degree is recognized within that schooling provision.
- Out-of-state licensure: ten years licensed as a journeyman or master elsewhere.
- Prior NH exam history: a previous New Hampshire journeyman or master examination.
Two details affect your real cost. First, approved school-based practical credit can cover up to 2,000 hours of the field requirement, with documentation required and no concurrent double counting of the same time. Second, field experience must be documented with employment dates, the type of work, and the supervising master's signature. Missing paperwork can delay approval, and a delayed approval is a delayed paycheck at journeyman rates.
You may see commercial summaries describing a 576-hour schooling figure. The retrieved rule text says 600 hours, including 24 safety hours, so use the regulation rather than a course seller's shorthand. Our full eligibility breakdown walks through the paperwork, and our NH-JE training overview covers how apprenticeship and schooling fit together.
Test Center vs. Remote: Cost Implications
The exam can be taken at Prov testing centers or remotely through Examroom.ai. The $90 fee is the verified figure; we have not verified a different price for either delivery mode, so confirm at scheduling that your chosen option does not change what you pay.
| Factor | Prov test center | Remote via Examroom.ai |
|---|---|---|
| Travel | Time and fuel to reach a center | None, but you need a suitable space |
| Calculator | Simple four-function calculator permitted | Remote system and equipment instructions are separate; read them before test day |
| Setup risk | Low; center provides the environment | Higher; your equipment and room must meet the rules |
| Cost of a technical failure | Rare | Could cost you an attempt if you are unprepared |
For a 270-minute exam, the practical question is not only price but risk. A remote setup problem that derails a sitting can cost you $90 plus the two-day retake gap. If your home internet or workspace is unreliable, a test center may be the cheaper choice in total.
Code Books and Reference Materials
This is the area where candidates are most likely to overspend. The exam bulletins list approved references, and the rules on what you may bring are specific. The reference list includes the American Electrician's Handbook (17th edition), Ugly's Electrical References (2020), NH Elec 300-400 and RSA 319-C, and named 2017 state amendments, alongside the NEC.
Rules on how you may mark your books also affect what you buy. Prior highlighting, pen underlining and permanent tabs are allowed. Handwritten notes, movable tabs and sticky notes, and practice tests are prohibited. Authorized printed state reference documents are allowed. In budget terms, that means one clean, well-tabbed copy is worth more than several editions you cannot use consistently. Build your tabs ahead of time with permanent tabs only, then verify against the current bulletin that your setup complies.
Prep Spending Tied to the Exam Blueprint
The most useful free resource is the exam's own structure. The official bulletins list twelve headings, with 110 total questions allocated across them. Allocation counts differ slightly between the two bulletins, which is part of the edition conflict above, but the shape is consistent, so you can direct limited prep money toward the heaviest areas rather than spreading it evenly.
| Domain | 2025 bulletin questions | 2026 bulletin questions |
|---|---|---|
| 1. General Electrical Knowledge | 22 | 21 |
| 2. Equipment for General Use | 9 | 9 |
| 3. Motors and Generators | 19 | 19 |
| 4. Control Devices | 5 | 5 |
| 5. Special Conditions | 2 | 2 |
| 6. Special Equipment | 2 | 2 |
| 7. Special Occupancies | 2 | 2 |
| 8. Services and Service Equipment | 12 | 12 |
| 9. Branch Circuits and Conductors: | 6 | 6 |
| 10. Feeders | 8 | 8 |
| 11. Wiring Methods & Materials | 14 | 14 |
| 12. Administrative | 9 | 10 |
Both columns total 110. General Electrical Knowledge is the largest domain in both, and Motors and Generators holds steady at 19. The conflicting counts for General Electrical Knowledge and Administrative are exactly what needs OPLC/Prov confirmation, so treat those two as approximate. Percentage weights are not published, and we have not inferred them. The "Branch Circuits and Conductors:" heading keeps its trailing colon because that is how the source prints it.
Where a Prep Dollar Goes Furthest
Because the question counts are uneven, prioritize accordingly.
- Motors and Generators: 19 questions is a large block for a single technical topic, so a candidate weak here has more to lose than in Special Conditions or Special Occupancies, which carry only 2 each.
- Wiring Methods & Materials: 14 questions that reward fast, accurate code navigation, which is where your tabbed book pays for itself.
- Services and Service Equipment: 12 questions, a reliable area to master with a focused review.
- Administrative: 9 or 10 questions depending on the bulletin. Some commercial courses exclude Administrative topics entirely; JADE Learning's public New Hampshire product page states this explicitly. Verify coverage before you pay, and cover Administrative with the state rules and RSA 319-C you are allowed to reference.
For a deeper walk through each heading, see our guide to all 12 NH-JE exam domains, and for a sequenced plan, our NH-JE study guide. You can also drill the material on our practice test site. Our practice questions are original and are not copies of live exam items, which matters because the rules prohibit bringing practice tests into the exam.
Weight your schedule by question count
- Front-load Motors and Generators and General Electrical Knowledge, the two largest blocks.
- Pair Services and Service Equipment with Feeders and Branch Circuits, since they share calculation habits.
Reserve time for code navigation and Administrative
- Practice finding answers in your tabbed references, since a 270-minute window still rewards speed.
- Review the state rules and RSA 319-C for Administrative content.
If you are weighing how hard the exam will be against how much to invest, our difficulty guide gives that context, and our one-page cheat sheet is a low-cost final review.
Costs After You Pass: Renewal and Code-Cycle Training
Passing the exam does not end your expenses. Two recurring obligations are worth budgeting for, and they are easy to confuse.
Two Separate Obligations
These come from different rules and run on different clocks.
- License renewal (Elec 401.01): amended effective May 4, 2024, renewal is set at two years from issuance. Older descriptions that mention a three-year term are out of date.
- NEC-change training (Elec 403.01): 15 hours on the latest NEC changes, including at least one hour on New Hampshire laws, rules and installation concerns, completed by the end of the calendar year following the NEC edition's publication. This is tied to the code cycle, not your renewal date.
Renewal fees and course tuition were not verified here, so check current amounts with the OPLC and with approved course providers. Because the 15-hour requirement follows the code cycle rather than your biennial renewal, you may owe training at a time that does not line up with your license anniversary. Plan for it as its own line item.
Weighing all of this against earnings is a separate question. We have not verified salary amounts, and we do not treat salary figures as promises. For that discussion, see our salary guide and our ROI analysis, and for where licensed journeymen find work, our NH-JE jobs overview.
Budget Table at a Glance
| Cost item | Status | Verified amount |
|---|---|---|
| Written exam fee (per attempt, retakes included) | Verified | $90 |
| State licensing charges beyond the exam fee | Not verified | Confirm with OPLC |
| Field apprenticeship hours | Verified requirement | 8,000 hours (not a cash fee) |
| Electrical schooling | Verified requirement | 600 hours incl. 24 safety hours (tuition varies) |
| Code books and references | Varies | Edition question unresolved; verify before buying |
| Prep materials | Varies | Check domain coverage, especially Administrative |
| Renewal | Interval verified | Every two years; fee not verified |
| NEC-change training | Requirement verified | 15 hours per code cycle; tuition not verified |
For a broader introduction to the credential itself, see our NH-JE certification overview, and for a pricing reference as the series evolves, this cost breakdown is updated as new information is verified.
Frequently Asked Questions
The written exam fee is $90 per attempt, effective February 1, 2025, and that amount applies to retakes as well. Separate state licensing charges were not verified, so confirm those with the OPLC.
No. The $90 fee includes retakes, so each sitting costs the same. You must wait a two-day interval between attempts, and your testing eligibility lasts 365 days from approval.
Typically the eligibility requirements: 8,000 field apprenticeship hours plus an education or experience alternative, such as 600 schooling hours including 24 safety hours. These are mostly time and tuition costs rather than state fees.
That is unresolved. The December 2025 bulletin labels the exam 2023 while listing both 2023 and 2020 NEC entries, and the August 2026 bulletin specifies the 2020 NEC. Confirm the governing edition with the OPLC or Prov before spending on a single edition.
Licenses renew every two years from issuance under Elec 401.01. Separately, Elec 403.01 requires 15 hours on the latest NEC changes, including at least one hour on New Hampshire laws and rules, tied to the code cycle rather than your renewal date.